Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Protection of Zero-Sequence Power Variation in Mountain Wind Farm Collector Lines Based on Multi-Mode Grounding

    Hongchun Shu1,2, Yaqi Deng1,2,*, Pulin Cao2, Jun Dong2, Hongjiang Rao2, Zhiqian Bo2

    Energy Engineering, Vol.119, No.2, pp. 523-538, 2022, DOI:10.32604/ee.2022.015570

    Abstract The arc-suppression coil (ASC) in parallel low resistance (LR) multi-mode grounding is adopted in the mountain wind farm to cope with the phenomenon that is misoperation or refusal of zero-sequence protection in LR grounding wind farm. If the fault disappears before LR is put into the system, it is judged as an instantaneous fault; while the fault does not disappear after LR is put into the system, it is judged as a permanent fault; the single-phase grounding fault (SLG) protection criterion based on zero-sequence power variation is proposed to identify the instantaneous-permanent fault. Firstly, the distribution characteristic of zero-sequence voltage… More >

  • Open Access

    ARTICLE

    Power Data Preprocessing Method of Mountain Wind Farm Based on POT-DBSCAN

    Anfeng Zhu, Zhao Xiao, Qiancheng Zhao*

    Energy Engineering, Vol.118, No.3, pp. 549-563, 2021, DOI:10.32604/EE.2021.014177

    Abstract Due to the frequent changes of wind speed and wind direction, the accuracy of wind turbine (WT) power prediction using traditional data preprocessing method is low. This paper proposes a data preprocessing method which combines POT with DBSCAN (POT-DBSCAN) to improve the prediction efficiency of wind power prediction model. Firstly, according to the data of WT in the normal operation condition, the power prediction model of WT is established based on the Particle Swarm Optimization (PSO) Arithmetic which is combined with the BP Neural Network (PSO-BP). Secondly, the wind-power data obtained from the supervisory control and data acquisition (SCADA) system… More >

Displaying 1-10 on page 1 of 2. Per Page