Home / Advanced Search

  • Title/Keywords

  • Author/Affliations

  • Journal

  • Article Type

  • Start Year

  • End Year

Update SearchingClear
  • Articles
  • Online
Search Results (2)
  • Open Access

    ARTICLE

    Construction Monitoring and Analysis of Asymmetric Prestressed Concrete Bridge Crossing Multiple-Line Railways

    Yi Wang1, Bing Wang2, Changwen Li2, Feng Zheng1, Yong Liu2, Shaohua He3,*

    Structural Durability & Health Monitoring, Vol.19, No.2, pp. 385-398, 2025, DOI:10.32604/sdhm.2024.054761 - 15 January 2025

    Abstract Complex bridge structures designed and constructed by humans often necessitate extensive on-site execution, which carries inherent risks. Consequently, a variety of engineering practices are employed to monitor bridge construction. This paper presents a case study of a large-span prestressed concrete (PC) variable-section continuous girder bridge in China, proposing a feedback system for construction monitoring and establishing a finite element (FE) analysis model for the entire bridge. The alignment of the completed bridge adheres to the initial design expectations, with maximum displacement and pre-arch differences from the ideal state measuring 6.39 and 17.7 mm, respectively, which More >

  • Open Access

    ARTICLE

    Process Monitoring and Terminal Verification of Cable-Stayed Bridges with Corrugated Steel Webs under Contruction

    Kexin Zhang, Xinyuan Shen, Longsheng Bao, He Liu*

    Structural Durability & Health Monitoring, Vol.17, No.2, pp. 131-158, 2023, DOI:10.32604/sdhm.2023.023431 - 09 May 2023

    Abstract In this paper, the construction process of a cable-stayed bridge with corrugated steel webs was monitored. Moreover, the end performance of the bridge was verified by load test. Owing to the consideration of the bridge structure safety, it is necessary to monitor the main girder deflection, stress, construction error and safety state during construction. Furthermore, to verify whether the bridge can meet the design requirements, the static and dynamic load tests are carried out after the completion of the bridge. The results of construction monitoring show that the stress state of the structure during construction… More >

Displaying 1-10 on page 1 of 2. Per Page