Open Access iconOpen Access

ARTICLE

crossmark

Conductor Arrangement and Phase Sequence Optimization Scheme for 500 kV Four-Circuit Transmission Lines on Same Tower

Deng Lu1, Xujun Lang1, Bo Yang1, Ziyang Li1, Hang Geng2,*

1 Power Grid Design and Research Institute, Shandong Electric Power Engineering Consulting Institute Co., Ltd., Jinan, 250012, China
2 School of Electrical Engineering, Shandong University, Jinan, 250061, China

* Corresponding Author: Hang Geng. Email: email

Energy Engineering 2023, 120(10), 2287-2306. https://doi.org/10.32604/ee.2023.029140

Abstract

The four-circuit parallel line on the same tower effectively solves the problems faced by the line reconstruction and construction under the condition of the increasing shortage of transmission corridors. Optimizing the conductor and phase sequence arrangement of multiple transmission lines is conducive to improving electromagnetic and electrostatic coupling caused by electromagnetic problems. This paper uses the ATP-EMTP simulation software to build a 500 kV multi-circuit transmission line on the same tower. It stimulates the induced voltage and current values of different line lengths, tower spacing, vertical and horizontal spacing between different circuits, phase sequence arrangement, and nominal tower height. Moreover, use the BP neural network optimized by a genetic algorithm to predict the induced voltage and current under the unknown conductor and phase sequence arrangement. Finally, based on multi-objective particle swarm algorithm to construct the optimization model of conductor arrangement scheme of overhead transmission line, combined with electromagnetic environment control index, determine the optimal conductor arrangement scheme by the size of particle fitness function, a significant reduction in induced voltages and currents between transmission lines and the four-circuit conductor layout scheme meeting the requirements of the electromagnetic environment is obtained, which provides a reference for the tower design of the transmission station project.

Keywords


Cite This Article

APA Style
Lu, D., Lang, X., Yang, B., Li, Z., Geng, H. (2023). Conductor arrangement and phase sequence optimization scheme for 500 kv four-circuit transmission lines on same tower. Energy Engineering, 120(10), 2287-2306. https://doi.org/10.32604/ee.2023.029140
Vancouver Style
Lu D, Lang X, Yang B, Li Z, Geng H. Conductor arrangement and phase sequence optimization scheme for 500 kv four-circuit transmission lines on same tower. Energ Eng. 2023;120(10):2287-2306 https://doi.org/10.32604/ee.2023.029140
IEEE Style
D. Lu, X. Lang, B. Yang, Z. Li, and H. Geng "Conductor Arrangement and Phase Sequence Optimization Scheme for 500 kV Four-Circuit Transmission Lines on Same Tower," Energ. Eng., vol. 120, no. 10, pp. 2287-2306. 2023. https://doi.org/10.32604/ee.2023.029140



cc This work is licensed under a Creative Commons Attribution 4.0 International License , which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
  • 322

    View

  • 213

    Download

  • 0

    Like

Share Link